Military Turnkey Solutions  


Rapid Deployment Secure Storage

Dehumidified and/or temperature controlled environment
Optional insulation to R-12
Lighting and electrical systems are available
Shelter can be relocated quickly
Modular extensions are available to add length
Most sizes do not require a concrete foundation
Very little site preparation
Custom doors from 12 ft. wide to 120 ft. wide
Lightning protection and grounding systems are available
Ventilation systems
Big Top Shelters do not count against the base sq footage

Columbia
 
Fort Knox
The USA and Columbian Governments joined forces with NAS (Narcotics Aviation Service) and Dyncorp to provide helicopter, aircraft, and storage shelters throughout the jungles of Columbia. The shelters protect maintenance crew members and equipment from inclement weather while providing a station in which they can be ready for combat quickly and efficiently. The flight line sunshades also reduce the aircraft temperature up to 24 degrees.   Big Top was asked by the US government to install this opaque-sided storage shelter with a skylight and white roof and they needed it quick. The shelter was purchased off GSA. This was a turnkey project and was completed and installed within two weeks of the order date.
McDill Air Force Base
 
US Naval Academy

This Custom structure measuring 60ft wide x 63ft Long x 18ft Center Height, was first installed at McDill AFB in August of 1996. This structure helps maintain equipment readiness for immediate deployment. Since 1996, the structure has been relocated to another location at McDill. The large 40ft wide door flap on the entrance side of the shelter helps limit the wasted space in the front of the building.

  The US Navy approached Big Top to do a project that involved four shelters. The four structures made up a recycling center that housed incinerators, sorting facilities, bailers for cardboard and storage for recyclables.
     
Afghanistan USAID
 
Afghanistan USAID
Big Top custom designed this aircraft storage and maintenance facility, taking into consideration the customers' needs and space available at the Kabul International Airport. Big Top was chosen for the project because the sales manager was available to them 24 hours a day via email. This structure is portable and was built and delivered with accelerated lead time.
 
USMC Albany
 
Pakistan

These 150ft Wide x 100ft Long x 40ft tall warehouse structures were installed in 2004 at the Marine Corp Logistics facility in Albany. The structure is installed on an asphalt parking lot.

   
     
Fort Hueneme
   
     

Big Top Manufacturing   •   3255 N. US 19   •   Perry, Florida 32347 USA
1-800-277-8677  •  International: +1-850-584-7786
sales@bigtopshelters.com   •   FAX 850-584-7713

©2008 Big Top Manufacturing ~ All Rights Reserved
Site designed by SculptNET Web Site Development, Inc.