Advantages of Big Top Shelters Big Top Manufacturing Company Profile Contact Big Top for Shelter Information Career Opportunities
Return to Home Page
   
APPLICATIONS
Marine Refit and Paint Enclosures
Warehousing Shelters and Solutions
Military Shelter Solutions
Environmental Shelters and Enclosures
Construction Shelters
Vehicle Inspection Shelters
Government/Public Works
Sports and Ehibition
RV and Boat Storage
Other Custom Solutions
FEATURES & SPECIFICATIONS
Quick Installation
Sizes
Fabric Options
Foundation Options
HVAC and Door Options
Wheels and Crane Liftable
Electrical
Lightning Protection
ON-SITE SERVICES
Site Survey and Consulting
Installation Support
Worldwide Transportation
 
  Live chat by LivePerson
 
 
View new projects in progress now

 

Marine Cargo, Refit & Paint Enclosures
<<Previous Page 12 3 4 5 6 Next Page >>
   

Barge, Container Ship, and Cargo Enclosures

Grit blast resistant materials with test data
Weld splatter/flame resistant
Lightweight structures for easy movement
Crane lift-wheel mountable
Rail mounting systems available
Turn-key installation available
 

Alberreci Construction
Lead Paint Abatement Shelter
The purpose of this structure was to provide a maintenance area protected from the weather where locked-dam gates, which had previously been painted with lead paint, could be sandblasted and repainted.
 
Alberreci Construction
This maintenance enclosure was built on the ground and lifted by crane onto the barge where we a rail system was installed for the shelter.  


Matson Navigation - Ocean Going Transport Parking Garage
Greatland 18,000 sq ft. and Lurline 21,000 sq ft.

2 Shelters: 52x100x18 each
New vehicles are transported from Seattle to Hawaii.

Matson
 
Matson
     
Matson
   
     
Matson
 
Matson
Big Top client, Matson Navigation, requested two large shelters to be installed on their cargo transport ships The Greatland and Lurline. The Greatland structure was an 18,400 sq ft. structure and the Lurline was 21,000 sq ft. Both were used to dock large car transport ships. The shelters were custom designed to protect cars from the ships' exhaust acid as well as withstand high wind speeds. Although used to transport cars from Seattle to Hawaii, the installation took place in China. Project was completed with accelerated lead time -- project was completed within six weeks of order.

Jacksonville US Navy
 
Hawaii
    This shelter was installed in Hawaii on an ocean-going barge to protect goods from the weather during transport to various islands.
     
<<Previous Page 12 3 4 5 6 Next Page >>

Big Top Manufacturing   •   3255 N. US 19   •   Perry, Florida 32347 USA
1-800-277-8677  •  International: +1-850-584-7786
sales@bigtopshelters.com   •   FAX 850-584-7713

©2008 Big Top Manufacturing ~ All Rights Reserved
Site designed by SculptNET Web Site Development, Inc.