| Lead
Paint Abatement Shelter - The purpose of
this structure was to provide a maintenance area
protected from the weather where locked-dam gates,
which had previously been painted with lead paint,
could be sandblasted and repainted. The maintenance
enclosure was built on the ground and lifted by
crane onto the barge where a rail system was installed
for the shelter. |
|
Big Top shelters can span existing
walls to protect the contents below. At this
job site in Pennsylvania this customer used 2
units 44ft x 75ft long x 13ft center height structures
to cover four different buildings. The crane
in the picture relocates each structure to the
working area based on the job schedule. |